Group Captive Power - Gujarat

Wind Power Sale in Gujarat  - Group Captive Scheme

Any energy consumer (Industrial / Commercial) can source electricity from the captive power plant, under Group Captive Scheme, as specified in The Electricity Rules, 2005, published by Ministry of Power and approved by DISCOM under Group Captive Scheme. Consumers are required to hold minimum 26% equity in the Wind project and should consume minimum 51% of power generated from the Wind Power.

Many consumers across the country can source energy from Wind Power through Group Captive Scheme.

The landed cost of Wind Power is lower than the cost of 
DISCOM. Electricity is wheeled to consumption point through existing DISCOM grid network. No infrastructure change is required in existing setup !!!!