Group Captive Power - Mumbai Maharashtra



Wind Power Sale in Mumbai  - Group Captive Scheme

Any energy consumer (Industrial / Commercial) can source electricity from captive power plant, under Group Captive Scheme, as specified in The Electricity Rules, 2005, published by Ministry of Power and approved by MAHADISCOM under Group Captive Scheme. Consumer is required to hold minimum 26% equity in the Wind project and should consume minimum 51% of power generated from the Wind Power.

Many consumers in TN are sourcing energy from Wind Project through Group Captive Scheme.

The landed cost of Wind Power is lower than cost of
MAHADISCOM. Electricity is wheeled to consumption point through existing MAHADISCOM grid network. No infrastructure change is required in existing set up !!!!

Tag: